Get our free email newsletter

Testing

EMC Lab Selection – Revisited

1310 F1 coverDesigners and manufacturers of electronic products are frequently faced with the question: “How do I find a high-quality EMC testing laboratory where I can confidently test my products?” The emphasis of the great majority of design and/or manufacturing entities is on obtaining (1) quality preliminary testing of EMC characteristics to refine the design of their products and (2) quality final design testing of their product for regulatory approvals. The final design, of course, is what gets manufactured and released to the general population for their use in daily life. This article is intended to aid designers and manufacturers in finding and utilizing high-quality EMC testing laboratories.

Problems That Can Arise in a Working EMC Laboratory, and How Pre-test Verifications Can Help

1312 F1 coverThis article describes some of the everyday issues that can arise in a working EMC test laboratory which may affect the quality of the measurements made and illustrates these with real-life examples that demonstrate the importance of robust pre-test verifications. The main focus is on emissions testing, as this is perhaps the area where most problems can occur without being detected. The article also looks at how using various types of reference source during pre-test verifications can help identify those problems and prevent invalid measurements being made.

A Brief History of Electrostatic Discharge Testing of Electronic Products

1403 esd-testing coverWith the inventions of the transistor in 1948 and the Integrated Circuit in 1958, and the utilization of these major breakthroughs in the development of computers and other electronic devices, industry began to worry about and to design components and end-products that could survive the discharge of electrostatic discharges to chips, printed circuit boards, and final packaged-products.

EMI vs. EMC: What’s in an Acronym?

1402 F1 cover"A rose by any other name would stink." – Kenneth Adamson

We have all seen advertising copy for test equipment manufacturers’ “EMC receivers” and “EMC test services” provided by commercial EMI test facilities. While we know what the aforementioned receiver does, and what sort of services the test facility supplies, the nomenclature is wrong and is symptomatic of a deeper problem.

Usability Engineering: Observe Users, Improve Product Safety

1402 F3 coverUp until now there’s been much emphasis on designing to make a product “idiot proof”. This has provided some benefit, but what Usability Engineering is reminding us is that it is the designers who are sometimes viewed as idiots by the users. It is the users who are the experts (in usability).

- From Our Sponsors -

Static Hocus Pocus

Associate Professor Neils Jonassen authored a bi-monthly static column that appeared in Compliance Engineering...

More Speed, More Insight: Use of FFT-based EMI Test Receivers for EMI Compliance Measurements

1312 F1 coverFFT-based EMI test receivers can be used for EMI compliance measurements in accordance with Amendment 1 to 3rd Edition of CISPR 16-1-1 if this standard is referenced in the product standard. The use is motivated by reducing the scan time by several orders of magnitude and to get more insight due to the possibility of applying longer measurement times and enhanced measurement functions like spectrum in persistence mode. For precise and reproducible measurements the use of preselection filters is highly recommended.

A Wide-band Hybrid Antenna for Use in Reverberation Chambers

1312 F3 coverThis article describes the design and performance of a wide-band hybrid antenna suitable for use in reverberation chambers. The antenna is characterized over the frequency range 100 MHz to 25 GHz showing that it performs well above 200 MHz although its ultimate highest operating frequency has not been established.

EMC Test Laboratory Software Program Development: A Proven Process

1310 F3 coverAn EMC test engineer’s primary responsibility includes creating test plans, procedures, analyzing test data, generating test reports, and mitigating noncompliance challenges. Many times the EMC engineer must assume the role of a software test engineer and create test programs necessary to meet the project objectives.

Diamond Jubilee: The 60th Anniversary of the Use of the 41 Inch Rod Antenna in Military EMI Testing

1308 F2 coverThis year marks not only the title anniversary, but arguably also that of the beginning of the modern era in vehicle electromagnetic interference (EMI) testing. Radiated emission (RE) testing of equipment to be used on self-contained vehicles is performed at one meter or less versus testing at a distance of three meters or more for equipment designed for use in homes, offices and factories.

- From Our Sponsors -

Digital Sponsors

Become a Sponsor

Discover new products, review technical whitepapers, read the latest compliance news, and check out trending engineering news.

Get our email updates

What's New

- From Our Sponsors -

Sign up for the In Compliance Email Newsletter

Discover new products, review technical whitepapers, read the latest compliance news, and trending engineering news.