Get our free email newsletter

Don MacArthur

Don MacArthur, The Practical Engineer, is a Guest Contributor to In Compliance Magazine. He has over 30 years of experience in product development, EMC, testing, and product safety compliance. He has developed products for military, commercial, and industrial applications.

From This Author

A Non-Typical Use for an ESD Simulator

If you have to purchase an ESD Simulator, you might as well get as much mileage out of it as you can, right?

RF Power Amplifiers for Conducted RF Immunity Testing

If you’re performing commercial conducted radiated immunity tests strictly by the book, you will want to utilize a radio-frequency (RF) signal generator and power amplifier combination that fully complies with IEC 61000-4-6.

Important Considerations When Installing, Tearing Down, and Moving an EMC Chamber

You’re an expert at EMC testing but, when it comes to installing, tearing down, and moving an EMC chamber, you may not have a clear understanding of all of the non-engineering tasks that go along with such an important event.

An Alternative Approach to Specifying an EMI Filter

There has to be a better way of specifying EMI filter performance – one that shows a filter’s effectiveness in real-life situations. It turns out there is a better alternative test method that fulfills this need. This method is the insertion loss test method for non-50Ω systems, located in Annex C of the second edition of EN 55017 (a.k.a. CISPR 17).

RF Absorber Power Handling and Safety Considerations

The safety performance specifications of RF absorbers are just as important as the other attributes of RF absorber performance.
- From Our Sponsors -

EMI Measurement Receiver Requirements (CISPR 16-1-1)

If you’re performing commercial radiated and conducted emissions measurements strictly by the book, you will want to utilize a measurement receiver or spectrum analyzer that fully complies with CISPR 16-1-1.

How EMC Shielding is Defeated

If you’re an electrical engineer and consider proper EMC shielding a mechanical only issue, please reconsider your position and keep reading. Proper EMC shielding is both an electrical and mechanical design issue. Thoughtful coordination between the two disciplines is key to successful EMC shielding implementation on most product development projects.

EMC/Signal Integrity Simulation Software Common Terms

Are you just getting into software simulation and feeling a little overwhelmed with all the new jargon? This brief article will explain some of the most common terms used in the very exciting world of EMC/Signal Integrity simulation software, all in one location.

Let’s Talk About the Low Noise Measurement Probe

Ever tried to measure low-level signals in the presence of noise? Or wanted to capture a measurement isolated from ground, like that of an ungrounded hand-held digital multi-meter, but also needed to capture finer details of the signal, like those captured with an oscilloscope?

Let’s Talk About… The Value of Pre-compliance Testing

Without much effort and expense, it is possible to perform pre-compliance testing in a manner that saves considerable time and money without commercial or financial risks associated with purchasing a full-compliance test facility.
- From Our Sponsors -

Digital Sponsors

Become a Sponsor

Discover new products, review technical whitepapers, read the latest compliance news, and check out trending engineering news.

Get our email updates

What's New

- From Our Sponsors -

Sign up for the In Compliance Email Newsletter

Discover new products, review technical whitepapers, read the latest compliance news, and trending engineering news.